COBie 2.4, BS 1192-4:2014 and ARCHICAD 18/19 – Part 5: System, Assembly, Connection, Spare, Resource, Job, Impact, Document, Coordinate, Attribute and Issue

July 31, 2015. By

Introduction

We previously covered Instruction, Contact, Facility and Floor, Space and Zone, Component and Type. In this final post we look at the remaining parts of the COBie schema including Systems, Coordinates and Attributes .

Continue reading

COBie 2.4, BS 1192-4:2014 and ARCHICAD 18/19 – Part 4: Type

July 22, 2015. By

Introduction

In the previous posts we have covered Instruction, Contact, Facility, Floor, Space and Zone and Component. In this post we will focus on COBie’s requirements at the Type level. Types are something that the vast majority of ARCHICAD users will probably not be familiar with. However many other BIM tools filter data by Type so it is important to understand how this works when it comes to exchanging models both for IFC and COBie. Continue reading

COBie 2.4, BS 1192-4:2014 and ARCHICAD 18/19 – Part 1: Instruction, Contact, Facility and Floor

June 22, 2015. By

Introduction

For the past 12 months i’ve been presenting ‘The COBieNATOR’ which is a LIVE demonstration of COBie’s relationship to IFC. First showcased at BIM Show Live 2014 (see here for more details) I was subsequently asked to present it at a number of other events both in the UK and abroad. Having toured the world presenting the class, I thought it would be useful to share some of the information we presented in a more structured format. Continue reading

openBIM for Facilities Management

November 7, 2014. By

Introduction

The UK Government has defined 3 deliverables for publicly procured projects from April 1st 2016. These are PDF, native models and COBie (see diagram below). PAS 1192-2:2013 sets out the process for the production of these deliverables. Key to PAS 1192-2 is an Employers Information Requirement (EIR) which sets out a clients requirements for projects. Here begins the problem!
Continue reading